/https://siu.edu/search-results.php
Last Updated: Jul 28, 2025, 04:12 PM
The future project will resurface parking lot 37 which is located on Douglas Drive south of the Engineering complex.
The design will be completed through in-house resources and the construction will be bid in accordance with the Illinois Procurement Code and the SIU Board of Trustees Policies.